Motorway
M1 traffic and collisions
The M1 is a motorway of 203.4 miles, from Barnet to Leeds. This page covers its traffic at 97 DfT count points since 2000 and the collisions police recorded on it.
- Traffic in 2025 8.6bn vehicle miles
- Average daily traffic 115,234 vehicles a day, both directions
- Busiest section 160,205 J11 to J11A
- HGV share 13.2% of vehicle miles
- Traffic since 2019 +0.6% same count points
- Collisions, 2021 to 2025 1,929 4.8 per 100m vehicle miles
How busy is the M1?
On an average day in 2025, 115,234 vehicles passed each point on the M1, counting both directions. The busiest section is J11 to J11A (Luton, Central Bedfordshire), with 160,205 a day; the quietest listed is A406 to M1 spur, with 45,493.
Busiest sections, 2025
J11 to J11A carries 1.4 times the road’s average flow.
| Section | Vehicles a day |
|---|---|
| J11 to J11A Luton, Central Bedfordshire · 1.8 mi · HGVs 13.3% | 160,205 |
| J42 to J43 Leeds · 1.5 mi · HGVs 8.1% | 159,683 |
| J7 to J8 Hertfordshire · 1.0 mi · HGVs 11.6% | 158,937 |
| J8 to J9 Hertfordshire · 4.4 mi · HGVs 12.2% | 157,786 |
| J21 to J21A Leicestershire · 3.0 mi · HGVs 12.9% | 157,403 |
| J9 to J10 Hertfordshire, Central Bedfordshire · 2.4 mi · HGVs 11.8% | 157,370 |
| J6A to J7 Hertfordshire · 2.5 mi · HGVs 11.8% | 157,142 |
| J31 to J32 Rotherham · 2.0 mi · HGVs 13.3% | 155,303 |
| J41 to J42 Leeds · 1.4 mi · HGVs 8.5% | 152,398 |
| J10 to J11 Central Bedfordshire, Luton · 3.4 mi · HGVs 12.2% | 152,346 |
Source:DfT,UK Motoring analysis 2000 to 2025 Updated
Route
Barnet to Leeds · 203.4 miles
M1 traffic and collisions by section
60 sections between junctions, in route order. Each is the average of its DfT count points, weighted by length. 20 short link roads and spurs (6.9 miles) count in the road’s totals but are not listed.
Show all 60 sections Tap a column heading to sort
| # | |||
|---|---|---|---|
| 1 | A406 to M1 spurBarnet | 45,493 | 30 |
| 2 | J2 to J4Barnet | 66,698 | 32 |
| 3 | J4 to J5Harrow, Hertfordshire | 100,582 | 45 |
| 4 | J5 to J6Hertfordshire | 103,178 | 54 |
| 5 | J6 to J6AHertfordshire | 75,008 | 11 |
| 6 | J6A to J7Hertfordshire | 157,142 | 53 |
| 7 | J7 to J8Hertfordshire | 158,937 | 27 |
| 8 | J8 to J9Hertfordshire | 157,786 | 143 |
| 9 | J9 to J10Hertfordshire, Central Bedfordshire | 157,370 | 60 |
| 10 | J10 to J11Central Bedfordshire, Luton | 152,346 | 97 |
| 11 | J11 to J11ALuton, Central Bedfordshire | 160,205 | 47 |
| 12 | M1 slips north end to M1 slips south endCentral Bedfordshire | 128,805 | 10 |
| 13 | J11A to J12Central Bedfordshire | 137,679 | 58 |
| 14 | J12 to J13Central Bedfordshire | 137,140 | 84 |
| 15 | At J13Central Bedfordshire | 94,223 | 8 |
| 16 | J13 to J14Central Bedfordshire, Milton Keynes | 120,464 | 44 |
| 17 | J14 to J15Milton Keynes, West Northamptonshire | 113,762 | 93 |
| 18 | J15 to J15AWest Northamptonshire | 123,822 | 34 |
| 19 | J15A to J16West Northamptonshire | 121,280 | 30 |
| 20 | J16 to J17West Northamptonshire | 120,092 | 67 |
| 21 | J17 to J18West Northamptonshire | 106,351 | 19 |
| 22 | J18 to M6West Northamptonshire, Leicestershire | 110,877 | 18 |
| 23 | M6 to M6/A14Leicestershire | 71,331 | fewer than 3 |
| 24 | J19 to J20Leicestershire | 88,994 | 8 |
| 25 | J20 to J21Leicestershire | 90,647 | 43 |
| 26 | J21 to J21ALeicestershire | 157,403 | 38 |
| 27 | J21A to J22Leicestershire | 101,454 | 14 |
| 28 | J22 to J23Leicestershire | 110,322 | 23 |
| 29 | J23 to J23ALeicestershire | 106,784 | 14 |
| 30 | J23A to J24Leicestershire | 131,396 | 14 |
| 31 | At A50Leicestershire | 117,286 | 3 |
| 32 | A50 to J25Leicestershire, Derbyshire | 133,023 | 14 |
| 33 | J25 to J26Derbyshire, Nottinghamshire, Nottingham | 134,582 | 51 |
| 34 | J26 to J27Nottinghamshire | 129,501 | 26 |
| 35 | J27 to J28Nottinghamshire, Derbyshire | 128,737 | 14 |
| 36 | J28 to J29Derbyshire | 136,489 | 75 |
| 37 | J29 to J29ADerbyshire | 123,524 | 23 |
| 38 | J29A to J30Derbyshire | 129,468 | 27 |
| 39 | J30 to J31Derbyshire, Rotherham | 122,208 | 57 |
| 40 | J31 to J32Rotherham | 155,303 | 28 |
| 41 | J32 to M18 spurRotherham | 88,592 | 5 |
| 42 | M18 spur to J33Rotherham | 145,601 | 30 |
| 43 | J33 to J34Rotherham, Sheffield | 113,276 | 30 |
| 44 | At J34Sheffield | 138,072 | fewer than 3 |
| 45 | J34 to J35Sheffield | 136,926 | 24 |
| 46 | J35 to J35ASheffield, Barnsley | 127,194 | 15 |
| 47 | J35A to J36Barnsley | 101,953 | 7 |
| 48 | J36 to J37Barnsley | 107,026 | 30 |
| 49 | J37 to J38Barnsley | 100,622 | 24 |
| 50 | J38 to J39Barnsley, Wakefield | 97,475 | 25 |
| 51 | J39 to J40Wakefield | 130,896 | 26 |
| 52 | J40 to J41Wakefield, Leeds | 142,615 | 33 |
| 53 | J41 to J42Leeds | 152,398 | 29 |
| 54 | J42 to J43Leeds | 159,683 | 23 |
| 55 | J43 to J44Leeds | 79,481 | 4 |
| 56 | J44 to J45Leeds | 112,119 | 9 |
| 57 | J45 to J46Leeds | 110,133 | 15 |
| 58 | west end of Jn 46 to east end of Jn 46Leeds | 82,449 | fewer than 3 |
| 59 | J46 to J47Leeds | 83,466 | 17 |
| 60 | J47 to J48Leeds | 85,104 | 6 |
Vehicles a day is the average daily flow in 2025. “Since 2019” compares the same count points. Collisions are those with the M1 as the first road, placed on the nearest section by their recorded position; rates (per 100 million vehicle miles) are shown for sections of half a mile or more with 10 or more.
M1 traffic by vehicle type
Cars and taxis make up 67.6% of the vehicle miles on the M1. HGVs account for 13.2%, rising to 18.5% on J16 to J17.
Vehicle mix, 2025
Source:DfT,UK Motoring analysis 2000 to 2025 Updated
HGV share of traffic
| Year | HGV share |
|---|---|
| 2000 | 15.3% |
| 2001 | 14.9% |
| 2002 | 14.9% |
| 2003 | 14.4% |
| 2004 | 15.1% |
| 2005 | 14.7% |
| 2006 | 14.2% |
| 2007 | 14.3% |
| 2008 | 14.0% |
| 2009 | 12.9% |
| 2010 | 13.4% |
| 2011 | 13.0% |
| 2012 | 12.6% |
| 2013 | 12.7% |
| 2014 | 13.1% |
| 2015 | 13.6% |
| 2016 | 13.7% |
| 2017 | 13.6% |
| 2018 | 13.9% |
| 2019 | 13.5% |
| 2020 | 17.2% |
| 2021 | 16.5% |
| 2022 | 14.7% |
| 2023 | 14.2% |
| 2024 | 14.0% |
| 2025 | 13.2% |
Source:DfT,UK Motoring analysis 2000 to 2025 Updated
M1 traffic trend
Traffic on the M1 came to 8.56 billion vehicle miles in 2025. At the count points present in both years, it is up 0.6% on 2019, before the pandemic, and up 10.3% on 2015.
Vehicle miles a year
Like for like, traffic is up 27.0% on 2000.
| Year | Vehicle miles |
|---|---|
| 2000 | 6.6bn |
| 2001 | 6.9bn |
| 2002 | 7.1bn |
| 2003 | 7.3bn |
| 2004 | 7.6bn |
| 2005 | 7.5bn |
| 2006 | 7.5bn |
| 2007 | 7.3bn |
| 2008 | 7.2bn |
| 2009 | 7.3bn |
| 2010 | 7.3bn |
| 2011 | 7.2bn |
| 2012 | 7.4bn |
| 2013 | 7.7bn |
| 2014 | 7.6bn |
| 2015 | 7.7bn |
| 2016 | 7.8bn |
| 2017 | 8.0bn |
| 2018 | 8.1bn |
| 2019 | 8.5bn |
| 2020 | 6.4bn |
| 2021 | 7.2bn |
| 2022 | 8.1bn |
| 2023 | 8.3bn |
| 2024 | 8.1bn |
| 2025 | 8.6bn |
Source:DfT,UK Motoring analysis 2000 to 2025 Updated
Average daily flow
| Year | Vehicles a day |
|---|---|
| 2000 | 92,077 |
| 2001 | 96,299 |
| 2002 | 97,984 |
| 2003 | 101,322 |
| 2004 | 104,831 |
| 2005 | 103,428 |
| 2006 | 103,205 |
| 2007 | 101,458 |
| 2008 | 99,501 |
| 2009 | 100,655 |
| 2010 | 101,025 |
| 2011 | 99,939 |
| 2012 | 102,024 |
| 2013 | 105,322 |
| 2014 | 104,790 |
| 2015 | 105,922 |
| 2016 | 107,407 |
| 2017 | 108,298 |
| 2018 | 109,347 |
| 2019 | 114,575 |
| 2020 | 86,518 |
| 2021 | 96,420 |
| 2022 | 108,721 |
| 2023 | 112,251 |
| 2024 | 108,460 |
| 2025 | 115,234 |
Source:DfT,UK Motoring analysis 2000 to 2025 Updated
The chart counts the whole road as it was each year, so new or renumbered stretches move it. The percentage changes compare only count points present in both years. In 2025, 87 of the 97 count points were counted; DfT estimated the rest from earlier counts and local trends.
M1 collisions
Police recorded 1,929 collisions with the M1 as the first road from 2021 to 2025, 357 of them fatal or serious, including 49 fatal. That is 4.8 per 100 million vehicle miles, close to the 4.9 for all motorways in Great Britain. On average there were 1.9 a year for each mile of road.
Reported collisions by year
Down 12.8% from 2021 to 2025.
| Year | Slight | Fatal or serious |
|---|---|---|
| 2021 | 333 | 80 |
| 2022 | 329 | 70 |
| 2023 | 322 | 71 |
| 2024 | 300 | 64 |
| 2025 | 288 | 72 |
Source:DfT STATS19,UK Motoring analysis 2021 to 2025 Updated
Sections with the highest collision rates
Per 100 million vehicle miles, 2021 to 2025. Sections of half a mile or more with 10 or more collisions.
| Section | Per 100m vehicle miles |
|---|---|
| A406 to M1 spur Barnet · 30 collisions | 13.7 |
| J6 to J6A Hertfordshire · 11 collisions | 12.7 |
| J5 to J6 Hertfordshire · 54 collisions | 11.6 |
| J8 to J9 Hertfordshire · 143 collisions | 10.4 |
| J11A to J12 Central Bedfordshire · 58 collisions | 10.2 |
| J10 to J11 Central Bedfordshire, Luton · 97 collisions | 10.0 |
| J11 to J11A Luton, Central Bedfordshire · 47 collisions | 9.8 |
| J7 to J8 Hertfordshire · 27 collisions | 9.7 |
Source:DfT STATS19,UK Motoring analysis 2021 to 2025 Updated
A further 132 collisions were recorded at junctions where the M1 was the second road; they are not in the figures above. Fatal or serious uses DfT’s adjusted serious figures. How we count collisions
Council areas on the M1
In route order. Each is the highway authority DfT files the count points under.
- Barnet
- Harrow
- Hertfordshire
- Central Bedfordshire
- Luton
- Milton Keynes
- West Northamptonshire
- Leicestershire
- Derbyshire
- Nottinghamshire
- Nottingham
- Rotherham
- Sheffield
- Barnsley
- Wakefield
- Leeds
Planned closures on the M1 in England
National Highways has 124 planned closures on the M1 between 16 September 2026 and 30 September 2026, 118 of them starting in that period. 59 close a carriageway rather than a lane or slip road, and 115 start between 7pm and 6am.
-
Lane or slip Lane 1,2 closure southbound
-
Lane or slip M6 to M1 link road lane closure southbound
-
Carriageway M6 to M1 southbound link road closure
-
Lane or slip Hardshoulder and lane 1,2 closure southbound
-
Carriageway M62 eastbound Jct 29 betwenn exit and entry slip road carriageway closure
-
Carriageway M62 eastbound Jct 30 exit slip road closure
-
Lane or slip Lane 3,4 closure northbound
-
Lane or slip Lane 2,3 closure southbound
116 more planned closures in this period are not shown.
Planned closures only: National Highways can cancel or change them, and closures caused by incidents are not shown. Council roads in England are not covered. Roadworks and closures across the UK
Source:National Highways 2026-09-16 to 2026-09-30 Updated
Data sources and methodology
| Figures | Source | Period | Records | Updated |
|---|---|---|---|---|
| Traffic counts and vehicle mix | Road traffic statistics (AADF by count point) Department for Transport Derived statistics UK Motoring | 2000 to 2025 | 97 count points in 2025 | 15 September 2026 |
| Reported collisions | Road safety open data (STATS19) Department for Transport Derived statistics UK Motoring | 2021 to 2025 | 1,929 reported collisions | 15 September 2026 |
| Planned closures | Transport Data Feeds (DATEX II) National Highways | 2026-09-16 to 2026-09-30 | 2,304 planned closure schemes | 16 September 2026 |
- Annual average daily flow (AADF) is the average number of vehicles passing a point on a typical day of the year, both directions combined.
- Vehicle miles are AADF multiplied by link length and 365, summed over every count point link on the road.
- Sections join count point links between junctions, using the link lines in DfT’s major road database.
- STATS19 covers personal injury collisions reported to the police. Damage-only collisions are not included, and not every injury collision is reported.
- Serious and slight figures are DfT’s adjusted estimates, which allow for police forces moving to injury-based reporting.
- Counts of one or two collisions below Great Britain level are shown as “fewer than 3”.
Contains public sector information licensed under the Open Government Licence v3.0.
Powered by National Highways’ Transport Data Feeds