Trunk A-road

A5117 traffic and collisions

The A5117 is a trunk A-road of 8.2 miles, in West Cheshire. This page covers its traffic at 6 DfT count points since 2000 and the collisions police recorded on it.

Last updated
Records analysed
6 count points in 2025
Methodology
View methodology
  • Traffic in 2025 44m vehicle miles
  • Average daily traffic 14,844 vehicles a day, both directions
  • Busiest section 23,114 M53 to A5032
  • HGV share 2.9% of vehicle miles
  • Traffic since 2019 −10.4% same count points
  • Collisions, 2021 to 2025 53 20.6 per 100m vehicle miles

How busy is the A5117?

On an average day in 2025, 14,844 vehicles passed each point on the A5117, counting both directions. The busiest section is M53 to A5032 (West Cheshire), with 23,114 a day; the quietest listed is M56 to M53, with 8,915.

Busiest sections, 2025

M53 to A5032 carries 1.6 times the road’s average flow.

Sections of the A5117 with the highest average daily flow, 2025
Section Vehicles a day
M53 to A5032 West Cheshire · 1.6 mi · HGVs 2.0% 23,114
A41 to M56 West Cheshire · 1.1 mi · HGVs 3.4% 20,441
M56 to A540 West Cheshire · 0.8 mi · HGVs 3.2% 15,693
A5032 to A41 West Cheshire · 0.5 mi · HGVs 3.3% 15,188
A56 to M56 West Cheshire · 1.0 mi · HGVs 2.7% 13,581
M56 to M53 West Cheshire · 3.2 mi · HGVs 3.4% 8,915

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

Route

In West Cheshire · 8.2 miles

West Cheshire
Schematic route: each line joins the junctions at the ends of a DfT count point link.

A5117 traffic and collisions by section

6 sections between junctions, in route order. Each is the average of its DfT count points, weighted by length.

Sections Tap a column heading to sort
Sections of the A5117 in route order, 2025 traffic
#
1A56 to M56West Cheshire1.013,5812.7%+1.0%4
2M56 to M53West Cheshire3.28,9153.4%−33.2%1835.9
3M53 to A5032West Cheshire1.623,1142.0%−6.1%1827.0
4A5032 to A41West Cheshire0.515,1883.3%−6.0%4
5A41 to M56West Cheshire1.120,4413.4%+23.8%4
6M56 to A540West Cheshire0.815,6933.2%5

Vehicles a day is the average daily flow in 2025. “Since 2019” compares the same count points. Collisions are those with the A5117 as the first road, placed on the nearest section by their recorded position; rates (per 100 million vehicle miles) are shown for sections of half a mile or more with 10 or more.

A5117 traffic by vehicle type

Cars and taxis make up 84.7% of the vehicle miles on the A5117. HGVs account for 2.9%.

Vehicle mix, 2025

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

HGV share of traffic

HGVs as a share of vehicle miles on the A5117, by year
Year HGV share
2000 5.9%
2001 5.3%
2002 5.4%
2003 6.9%
2004 7.1%
2005 7.1%
2006 7.3%
2007 7.6%
2008 8.3%
2009 7.4%
2010 7.3%
2011 7.1%
2012 6.4%
2013 6.5%
2014 5.5%
2015 5.9%
2016 6.6%
2017 6.5%
2018 6.6%
2019 6.4%
2020 7.7%
2021 7.5%
2022 3.1%
2023 3.0%
2024 2.9%
2025 2.9%

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

A5117 traffic trend

Traffic on the A5117 came to 44.4 million vehicle miles in 2025. At the count points present in both years, it is down 10.4% on 2019, before the pandemic, and down 7.5% on 2015.

Vehicle miles a year

Like for like, traffic is up 15.7% on 2000.

Vehicle miles on the A5117 each year, the whole road as it was that year
Year Vehicle miles
2000 55m
2001 57m
2002 58m
2003 69m
2004 65m
2005 64m
2006 63m
2007 63m
2008 63m
2009 66m
2010 66m
2011 77m
2012 80m
2013 80m
2014 90m
2015 90m
2016 87m
2017 91m
2018 95m
2019 100m
2020 73m
2021 83m
2022 42m
2023 43m
2024 44m
2025 44m

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

Average daily flow

Average daily flow along the A5117, weighted by link length, by year
Year Vehicles a day
2000 16,098
2001 16,748
2002 17,134
2003 20,232
2004 19,236
2005 18,928
2006 18,636
2007 18,489
2008 18,588
2009 19,327
2010 19,310
2011 21,516
2012 22,223
2013 22,444
2014 25,084
2015 25,167
2016 24,331
2017 25,468
2018 25,319
2019 26,616
2020 19,398
2021 21,990
2022 14,108
2023 14,398
2024 14,841
2025 14,844

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

The chart counts the whole road as it was each year, so new or renumbered stretches move it. The percentage changes compare only count points present in both years. In 2025, 1 of the 6 count points were counted; DfT estimated the rest from earlier counts and local trends.

A5117 collisions

Police recorded 53 collisions with the A5117 as the first road from 2021 to 2025, 15 of them fatal or serious, including 3 fatal. That is 20.6 per 100 million vehicle miles, lower than the 31.5 for all A-roads in Great Britain. On average there were 1.3 a year for each mile of road.

Reported collisions by year

Down 42.9% from 2021 to 2025.

Police-reported collisions on the A5117 by year
Year Collisions
2021 14
2022 10
2023 8
2024 13
2025 8

Source:DfT STATS19,UK Motoring analysis 2021 to 2025 Updated

Sections with the highest collision rates

Per 100 million vehicle miles, 2021 to 2025. Sections of half a mile or more with 10 or more collisions.

Collisions per 100 million vehicle miles by section of the A5117, 2021 to 2025
Section Per 100m vehicle miles
M56 to M53 West Cheshire · 18 collisions 35.9
M53 to A5032 West Cheshire · 18 collisions 27.0

Source:DfT STATS19,UK Motoring analysis 2021 to 2025 Updated

A further 23 collisions were recorded at junctions where the A5117 was the second road; they are not in the figures above. Fatal or serious uses DfT’s adjusted serious figures. 100.0% of the collisions could be placed on a section. How we count collisions

Council areas on the A5117

In route order. Each is the highway authority DfT files the count points under.

  • West Cheshire

Planned closures on the A5117 in England

National Highways has 12 planned closures on the A5117 between 16 September 2026 and 30 September 2026, all of them starting in that period. 10 close a carriageway rather than a lane or slip road, and 12 start between 7pm and 6am.

  • Carriageway M56 Eastbound Jct 16 entry slip road closure

    16 Sept 21:00 to 24 Sept 06:00 Road maintenance Also affects M56

  • Carriageway M53 Southbound to M56 Eastbound link road closure

    16 Sept 21:00 to 26 Sept 06:00 Road maintenance Also affects M56

  • Lane or slip A494 Eastbound lane 2 closure (MP 3/1 to 1/9)

    16 Sept 21:00 to 24 Sept 06:00 Road maintenance Also affects M56

  • Carriageway M53 Southbound to M56 Eastbound link road closure

    16 Sept 21:00 to 24 Sept 06:00 Road maintenance Also affects M56

  • Carriageway A494 Eastbound Park Gate to M56 Jct 14 carriageway closure

    16 Sept 21:00 to 24 Sept 06:00 Road maintenance Also affects M56

  • Lane or slip A494 Eastbound lane 2 closure (MP 3/1 to 1/9)

    16 Sept 21:00 to 26 Sept 06:00 Road maintenance Also affects M56

  • Carriageway M53 Northbound to M56 Eastbound link road closure

    16 Sept 21:00 to 24 Sept 06:00 Road maintenance Also affects M56

  • Carriageway M53 Northbound to M56 Eastbound link road closure

    17 Sept 21:00 to 24 Sept 06:00 Road maintenance Also affects M56

4 more planned closures in this period are not shown.

Planned closures only: National Highways can cancel or change them, and closures caused by incidents are not shown. Council roads in England are not covered. Roadworks and closures across the UK

Source:National Highways 2026-09-16 to 2026-09-30 Updated

Data sources and methodology

Datasets used on this page
Figures Source Period Records Updated
Traffic counts and vehicle mix Road traffic statistics (AADF by count point) Department for Transport
Derived statistics UK Motoring
2000 to 2025 6 count points in 2025 15 September 2026
Reported collisions Road safety open data (STATS19) Department for Transport
Derived statistics UK Motoring
2021 to 2025 53 reported collisions 15 September 2026
Planned closures Transport Data Feeds (DATEX II) National Highways 2026-09-16 to 2026-09-30 2,304 planned closure schemes 16 September 2026
  • Annual average daily flow (AADF) is the average number of vehicles passing a point on a typical day of the year, both directions combined.
  • Vehicle miles are AADF multiplied by link length and 365, summed over every count point link on the road.
  • Sections join count point links between junctions, using the link lines in DfT’s major road database.
  • STATS19 covers personal injury collisions reported to the police. Damage-only collisions are not included, and not every injury collision is reported.
  • Serious and slight figures are DfT’s adjusted estimates, which allow for police forces moving to injury-based reporting.
  • Counts of one or two collisions below Great Britain level are shown as “fewer than 3”.

Contains public sector information licensed under the Open Government Licence v3.0.

Powered by National Highways’ Transport Data Feeds