Motorway

M23 traffic and collisions

The M23 is a motorway of 17.4 miles, from Surrey to West Sussex. This page covers its traffic at 8 DfT count points since 2000 and the collisions police recorded on it.

Last updated
Records analysed
8 count points in 2025
Methodology
View methodology
  • Traffic in 2025 591m vehicle miles
  • Average daily traffic 92,982 vehicles a day, both directions
  • Busiest section 119,367 A25 Flyover (Bletchingley Road) with M23 to J9
  • HGV share 4.9% of vehicle miles
  • Traffic since 2019 −0.3% same count points
  • Collisions, 2021 to 2025 150 5.4 per 100m vehicle miles

How busy is the M23?

On an average day in 2025, 92,982 vehicles passed each point on the M23, counting both directions. The busiest section is A25 Flyover (Bletchingley Road) with M23 to J9 (Surrey), with 119,367 a day; the quietest listed is J8 to J7, with 33,107.

Busiest sections, 2025

A25 Flyover (Bletchingley Road) with M23 to J9 carries 1.3 times the road’s average flow.

Sections of the M23 with the highest average daily flow, 2025
Section Vehicles a day
A25 Flyover (Bletchingley Road) with M23 to J9 Surrey · 6.0 mi · HGVs 4.9% 119,367
J7 to A25 Flyover (Bletchingley Road) with M23 Surrey · 1.6 mi · HGVs 4.9% 114,480
J10 to J9 West Sussex · 1.9 mi · HGVs 4.9% 97,998
J10A to J10 West Sussex · 1.9 mi · HGVs 5.1% 90,546
J11 to J10A West Sussex · 2.9 mi · HGVs 5.2% 79,264
J8 to J7 Surrey · 1.9 mi · HGVs 6.1% 33,107

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

Route

Surrey to West Sussex · 17.4 miles

Surrey West Sussex
Schematic route: each line joins the junctions at the ends of a DfT count point link.

M23 traffic and collisions by section

7 sections between junctions, in route order. Each is the average of its DfT count points, weighted by length. 1 short link roads and spurs (1.0 miles) count in the road’s totals but are not listed.

Sections Tap a column heading to sort
Sections of the M23 in route order, 2025 traffic
#
1J8 to J7Surrey1.933,1076.1%−2.9%3
2J7 to A25 Flyover (Bletchingley Road) with M23Surrey1.6114,4804.9%139.5
3A25 Flyover (Bletchingley Road) with M23 to J9Surrey6.0119,3674.9%479.0
4J10 to J9West Sussex1.997,9984.9%+3.5%216.5
5J10A to J10West Sussex1.990,5465.1%+7.4%309.8
6J11 to J10AWest Sussex2.979,2645.2%−1.5%225.5
7A23(T) to A264West Sussex0.257,1044.3%−1.6%5

Vehicles a day is the average daily flow in 2025. “Since 2019” compares the same count points. Collisions are those with the M23 as the first road, placed on the nearest section by their recorded position; rates (per 100 million vehicle miles) are shown for sections of half a mile or more with 10 or more.

M23 traffic by vehicle type

Cars and taxis make up 77.8% of the vehicle miles on the M23. HGVs account for 4.9%, rising to 6.1% on J8 to J7.

Vehicle mix, 2025

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

HGV share of traffic

HGVs as a share of vehicle miles on the M23, by year
Year HGV share
2000 5.5%
2001 5.5%
2002 5.3%
2003 5.2%
2004 5.1%
2005 4.9%
2006 5.1%
2007 5.2%
2008 5.7%
2009 4.8%
2010 5.5%
2011 5.3%
2012 5.2%
2013 5.2%
2014 5.4%
2015 4.9%
2016 5.0%
2017 4.9%
2018 5.0%
2019 5.7%
2020 7.3%
2021 6.8%
2022 5.2%
2023 5.0%
2024 4.8%
2025 4.9%

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

M23 traffic trend

Traffic on the M23 came to 591 million vehicle miles in 2025. At the count points present in both years, it is about the same as in 2019, before the pandemic, and up 3.0% on 2015.

Vehicle miles a year

Like for like, traffic is down 4.0% on 2000.

Vehicle miles on the M23 each year, the whole road as it was that year
Year Vehicle miles
2000 559m
2001 573m
2002 569m
2003 598m
2004 629m
2005 654m
2006 603m
2007 601m
2008 582m
2009 587m
2010 562m
2011 568m
2012 575m
2013 562m
2014 579m
2015 612m
2016 598m
2017 615m
2018 616m
2019 570m
2020 359m
2021 440m
2022 563m
2023 586m
2024 589m
2025 591m

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

Average daily flow

Average daily flow along the M23, weighted by link length, by year
Year Vehicles a day
2000 88,573
2001 90,800
2002 90,156
2003 94,737
2004 99,575
2005 103,589
2006 95,478
2007 95,111
2008 92,104
2009 92,912
2010 88,992
2011 89,963
2012 91,010
2013 89,037
2014 91,695
2015 96,849
2016 94,749
2017 97,414
2018 96,961
2019 89,696
2020 56,497
2021 69,203
2022 88,639
2023 92,196
2024 92,705
2025 92,982

Source:DfT,UK Motoring analysis 2000 to 2025 Updated

The chart counts the whole road as it was each year, so new or renumbered stretches move it. The percentage changes compare only count points present in both years (56.3% of today’s road for 2019). In 2025, 4 of the 8 count points were counted; DfT estimated the rest from earlier counts and local trends.

M23 collisions

Police recorded 150 collisions with the M23 as the first road from 2021 to 2025, 42 of them fatal or serious, including 3 fatal. That is 5.4 per 100 million vehicle miles, higher than the 4.9 for all motorways in Great Britain. On average there were 1.7 a year for each mile of road.

Reported collisions by year

Down 48.5% from 2021 to 2025.

Police-reported collisions on the M23 by year: fatal or serious, and slight
Year SlightFatal or serious
2021 294
2022 1811
2023 188
2024 3114
2025 125

Source:DfT STATS19,UK Motoring analysis 2021 to 2025 Updated

Sections with the highest collision rates

Per 100 million vehicle miles, 2021 to 2025. Sections of half a mile or more with 10 or more collisions.

Collisions per 100 million vehicle miles by section of the M23, 2021 to 2025
Section Per 100m vehicle miles
J10A to J10 West Sussex · 30 collisions 9.8
J7 to A25 Flyover (Bletchingley Road) with M23 Surrey · 13 collisions 9.5
A25 Flyover (Bletchingley Road) with M23 to J9 Surrey · 47 collisions 9.0
J10 to J9 West Sussex · 21 collisions 6.5
J11 to J10A West Sussex · 22 collisions 5.5

Source:DfT STATS19,UK Motoring analysis 2021 to 2025 Updated

A further 17 collisions were recorded at junctions where the M23 was the second road; they are not in the figures above. Fatal or serious uses DfT’s adjusted serious figures. 94.0% of the collisions could be placed on a section. How we count collisions

Council areas on the M23

In route order. Each is the highway authority DfT files the count points under.

  • Surrey
  • West Sussex

Planned closures on the M23 in England

National Highways has 18 planned closures on the M23 between 16 September 2026 and 30 September 2026, 15 of them starting in that period. 10 close a carriageway rather than a lane or slip road, and 15 start between 7pm and 6am.

  • Lane or slip M23 northbound lane 1 closure ( 52/6 to 50/0)

    16 Sept 20:00 to 24 Sept 06:00 1 of 3 lanes Road maintenance

  • Carriageway M23 northbound Jct 10 exit slip road closure

    16 Sept 21:00 to 17 Sept 06:00 Authority operation

  • Lane or slip M23 northbound lane 1 closure ( 52/6 to 50/0)

    17 Sept 20:00 to 23 Sept 06:00 1 of 3 lanes Road maintenance

  • Carriageway M23 southbound Jct 10a exit slip road closure

    17 Sept 21:00 to 30 Sept 06:00 Road maintenance

  • Carriageway M23 southbound Jct 10a exit slip road closure

    17 Sept 21:00 to 29 Sept 06:00 Road maintenance

  • Lane or slip M23 northbound lane 1 closure ( 52/6 to 50/0)

    18 Sept 20:00 to 30 Sept 06:00 1 of 3 lanes Road maintenance

  • Carriageway M23 southbound Jct 10a exit slip road closure

    18 Sept 21:00 to 30 Sept 06:00 Road maintenance

  • Carriageway M23 Southbound Jct 7 to Jct 8 lane closure

    21 Sept 22:00 to 25 Sept 05:30 Road maintenance Also affects A23

10 more planned closures in this period are not shown.

Planned closures only: National Highways can cancel or change them, and closures caused by incidents are not shown. Council roads in England are not covered. Roadworks and closures across the UK

Source:National Highways 2026-09-16 to 2026-09-30 Updated

Data sources and methodology

Datasets used on this page
Figures Source Period Records Updated
Traffic counts and vehicle mix Road traffic statistics (AADF by count point) Department for Transport
Derived statistics UK Motoring
2000 to 2025 8 count points in 2025 15 September 2026
Reported collisions Road safety open data (STATS19) Department for Transport
Derived statistics UK Motoring
2021 to 2025 150 reported collisions 15 September 2026
Planned closures Transport Data Feeds (DATEX II) National Highways 2026-09-16 to 2026-09-30 2,304 planned closure schemes 16 September 2026
  • Annual average daily flow (AADF) is the average number of vehicles passing a point on a typical day of the year, both directions combined.
  • Vehicle miles are AADF multiplied by link length and 365, summed over every count point link on the road.
  • Sections join count point links between junctions, using the link lines in DfT’s major road database.
  • STATS19 covers personal injury collisions reported to the police. Damage-only collisions are not included, and not every injury collision is reported.
  • Serious and slight figures are DfT’s adjusted estimates, which allow for police forces moving to injury-based reporting.
  • Counts of one or two collisions below Great Britain level are shown as “fewer than 3”.

Contains public sector information licensed under the Open Government Licence v3.0.

Powered by National Highways’ Transport Data Feeds